titan 40
![T40 Double Deck Production Medical Unit](https://static.wixstatic.com/media/c52391_59d84715c5ff4178bf153bafa055a3b6~mv2.jpg/v1/fill/w_147,h_104,al_c,q_80,usm_0.66_1.00_0.01,blur_2,enc_auto/c52391_59d84715c5ff4178bf153bafa055a3b6~mv2.jpg)
![T40 Double Deck Production Medical Unit](https://static.wixstatic.com/media/c52391_33529e9874cf4f2880eaa2e765a8850c~mv2.jpg/v1/fill/w_147,h_104,al_c,q_80,usm_0.66_1.00_0.01,blur_2,enc_auto/c52391_33529e9874cf4f2880eaa2e765a8850c~mv2.jpg)
![Titan 40](https://static.wixstatic.com/media/c52391_5941e6c71c6e451cafb1fff57d59b445~mv2.jpg/v1/fill/w_147,h_85,al_c,q_80,usm_0.66_1.00_0.01,blur_2,enc_auto/c52391_5941e6c71c6e451cafb1fff57d59b445~mv2.jpg)
![T40 Double Deck Production Medical Unit](https://static.wixstatic.com/media/c52391_59d84715c5ff4178bf153bafa055a3b6~mv2.jpg/v1/fill/w_147,h_104,al_c,q_80,usm_0.66_1.00_0.01,blur_2,enc_auto/c52391_59d84715c5ff4178bf153bafa055a3b6~mv2.jpg)
Double Deck Production/Medical Trailer
Titan 40, ex 13.6m Disaster recovery double deck trailer. The unit is being refurbished to a high standard and consists of an open plan double deck area, staircase and coffee station area then fully open plan bottom level. This unit is perfect for production/medical use. The unit is fully air-conditioned in each area. Large 45KVA fitted generator, coms, power and cat 5 connections in each area with external connectivity. The unit can be fully deployed in 40 minutes and can be configured and branded to your requirements.
-
Double Deck Unit
-
Open plan offices upstairs and downstairs
-
45 KVA Silent generator power
-
Air-conditioning top and bottom
-
1 SES Unit manager 40 minute set-up
-
Internal fire emergency escape from top deck
-
Re-fitted 2024
Download Specification